Monday, July 6, 2026

Edo: BEDC blames power outage on low generation, outstanding debts

“Customers have a role to play by paying for electricity consumed through BEDC accredited billing agents,” he said.

• April 5, 2024
Benin Electricity Distribution Company (BEDC)
Benin Electricity Distribution Company (BEDC)

The management of the Benin Electricity Distribution Company (BEDC) Plc, on Friday, linked power outage in its franchise states of Edo, Delta, Ondo and Ekiti to low generation of power by the power generating companies (Gencos).

The chief technical officer (CTO), BEDC, Jonathan Lawani, while giving an overview of BEDC operations at a media parley in Benin, said the power problem currently being experienced in the state was not peculiar to BEDC alone but affecting all Discos.

Mr Lawani stated that Nigeria was heavily dependent on gas for power generation, adding that the gas suppliers had refused to supply gas to generating companies because they had yet to settle their outstanding debts.

“Gas suppliers are saying Gencos are owing, Gencos are saying TCN is owing, TCN is saying Discos are owing and Discos are saying that customers are not paying their bills.

“So if power supply must improve, customers have a role to play by paying for electricity consumed through BEDC accredited billing agents,” he said.

He also attributed the non-availability of power to the increased energy theft and vandalism currently ongoing in its network.

He disclosed that out of every 10 metres installed, six were tempered with either at the point of installation or after installation resulting in loss of revenue.

“This is a major problem in all the Discos, not only in BEDC. And you will agree with us that we need this revenue to purchase energy for distribution.

“We are working with the various state governments where we operate to come up with regulations to curb the menace,” he added.

Speaking further, he said the minister of power was working round the clock to resolve the low generation problem, adding that BEDC had resulted in load shedding of the power allocated to it.

According to him, BEDC has concluded the upgrade of its network and now has over 75 33KVA voltage lines covering over 5,000Km in terms of length and over 3,022 11KVA feeders that provide service to customers.

He noted that with the upgrade, “BEDC now has more capacity to take power when power generation improves.”

The CTO appealed to the media to join in the fight against vandals, adding that the company records more than 10 cases of vandalism on a daily basis.

He called on the various communities across BEDC operational areas to take responsibility for the network lines in their domains.

(NAN)

We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.

More from Peoples Gazette

farmers

Agriculture

FG tasks ECOWAS on leveraging financing strategies for agroecology

The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Katsina State

Politics

Katsina youths pledge to deliver over 2 million votes to Atiku

“Katsina State is Atiku’s political base because it is his second home.”

States

Three suspected cultists arrested in Akwa Ibom

The police command in Akwa Ibom arrested three suspected members of the Vikings confraternity following a raid on a residential building.

States

Troops arrest 12 suspected Boko Haram collaborators in Borno

The military described the operation as a breakthrough in ongoing efforts to dismantle terrorist support structures.

Police

States

Police intercept 81 vehicles over plate number violations in Kano

The CP said the command had observed an alarming increase in the number of vehicles plying the roads across the state with covered number plates.

NationWide

Land Use Act: Governors should emulate Uba Sani, says HURIWA

The group commended the recent compensation to households affected by the 15-kilometre ring road project.

Plateau State logo

States

Flooding: Plateau govt expands waterways, clears drainage systems

Mr Dapiya said the intervention followed recurring flash floods, largely caused by blocked drainage channels resulting from indiscriminate waste disposal.

Court room

Anti-Corruption

Police arraign visa agent over alleged N7.6 million fraud

The defendant was arraigned on a two-count charge of fraud and stealing, to which he pleaded not guilty.