Three road projects in Kebbi to be completed within three weeks: FERMA

The Federal Road Maintenance Agency (FERMA) in Kebbi says it will complete the three ongoing direct labour road projects within three weeks in Kebbi.
The Federal Road Maintenance Engineer in charge of FERMA in the state, Rilwanu Usman, made this known in an interview with journalists in Birnin Kebbi on Monday.
He said the renewed hope in FERMA, under the leadership of Chukwuemeka Agbasi, believed in carrying out its mandate to the fullest.
He said the agency had constructed four cell box culverts at Wali to address the water problem on the Gotomo-Argungu-Sokoto road.
“We also constructed a reinforced concrete line drain, repaired a completely failed section, and made the Birnin-Kebbi to Sokoto border pothole-free through a very impactful programme called ‘Operation Safe Connect to Your Destination.’
“Through the programme, we made the Birnin Kebbi-Argungu-Sokoto border and the Kalgo-Kamba road pothole-free, as well as Bunza-Dakongari-Kende, which is a link to federal roads, pothole-free.
“As a result of this programme, the rate of accidents has now reduced drastically, as some of the accidents recorded in the past were attributed to potholes,” he said.
Mr Usman added that the agency had three direct labour road projects in 2024 in the state from January to date.
“At Wali, around kilometre 54, there was a collection of water; that is, stagnation of water to the extent that after a heavy downpour, all motorists plying the road have to park until the water recedes because of its force waves and movement. We have brought a permanent solution to the area now.
“We also have Birnin Kebbi-Argungu Road at Alwasa Community; there was a place that was notorious and has been undergoing serious rehabilitation and repairs.
“But now we got approval to construct three-metre by three-metre box culverts, which has now reached 60 per cent completion,” he said.
Mr Usman added that the Sokoto State border road along the Jega-Koko-Yauri-Niger state border road was being rehabilitated, saying it had reached 80 per cent completion.
“We have Argungu-Bui Road around Lailaba; serious embankments and rehabilitation have now reached a 55 per cent completion stage.
” All the projects will be completed within three to four weeks,” he assured.
Mr Usman reiterated Mr Agbasi’s commitment to making all federal roads in the state free and motorable all year round, even beyond potholes, within the limited resources.
He commended Governor Nasir Idris of Kebbi for his efforts in constructing befitting roads, installing solar streetlights, and creating an enabling environment for the agency to thrive.
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

Africa
Xenophobia: FG to airlift about 300 Nigerians from South Africa on Wednesday
The Nigerian High Commission in Pretoria and the consulate general in Johannesburg have announced plans to repatriate about 300 Nigerians from South Africa on Wednesday.

Economy
UK-Nigeria tech hub, Nest launch initiative to unify Nigeria’s innovation ecosystem
UK-Nigeria Tech Hub and the Nest Innovation Technology Park have partnered to launch the Nigeria Innovation Cluster Exchange.

Faith
Ibadan masquerader kills resident, police launch investigation
Police are investigating the killing of Sefiu Kehinde, a 24-year-old man allegedly attacked by a masquerader in the Labiran area of Ibadan.

Anti-Corruption
Court adjourns judgment in forfeiture suit against ex-AGF Malami
Although the court gave no reason for the adjournment, three other cases on the cause list were also given new dates out of the 13 matters before the court.

Diaspora
FULL LIST: Names, crimes of 4,000 Nigerians jailed in U.S. prison from 2016 to 2025
In a decade, 3,968 Nigerians have been convicted and jailed for different crimes in the United States’ federal prisons, a document exclusively obtained by Peoples Gazette shows.

Politics
State police will derail democracy, lead to tribal wars, ex-Governor Omehia warns Tinubu, Senate
Former Governor Celestine Omehia has cautioned Senate President Godswill Akpabio and the National Assembly against rushing the passage of the State Police Bill into law.






