The minister said that the overhaul of the DisCos was also aimed to demonstrate a replicable model for operational turnaround.
Mr Abdullah said the highest number of complaints received by FCCPC was on the power sector.
The house mandated its Committee on Power, when constituted, to interface with NERC to find common ground to address the proposed hike.
Mr Mohammed, who decried the spate of vandalism of its equipment, noted that the move to adopt technology in tackling the menace was laudable.
The AEDC has promised that the transformer would be powered before the close of work on Monday.
