Thursday, June 18, 2026

FG diverts traffic as repair works begin on Third Mainland Bridge Monday

The Federal Controller of Works, Lagos State, Olukorede Kesha, urged motorists to be patient during the period of repairs

• November 5, 2023
Third Mainland Bridge
Third Mainland Bridge

The Federal Controller of Works, Lagos State, Olukorede Kesha, has appealed to motorists to use alternative routes to avert gridlock as repairs begin on Monday along the Adekunle ramps of the Third Mainland Bridge. 


Ms Kesha made the appeal on Sunday while addressing journalists on the 11.8-kilometre Third Mainland Bridge in Lagos.


She said the repairs would begin on November 6, and the Adekunle exit ramp would be closed to traffic from 9.00 am. for two weeks’ rehabilitation, after which work would move to other areas.


She said the Adekunle section of the Third Mainland Bridge had four ramps that had a convergence point, adding that repair of all the ramps would be completed within five weeks.


She said the sensitisation became necessary to guide motorists, assuring that the Third Mainland Bridge was open and free for use except for those that would want to connect Adekunle from the bridge.


“We are here to sensitise Lagosians on the forthcoming closure of the Third Mainland Bridge tomorrow, November 6. By 9:00 am., the two access ramps to Adekunle will be closed to traffic.


“What that means is that if you are coming from Iyana Oworo, you can go straight. And if you are heading for Lagos Island, the road is still free for you; that bridge is still free for you.


“You can use it straight to the Island, but per adventure, if you are going to Adekunle, you will not be able to do that if you are coming from Iyana Oworo,” she said.


The controller said motorists coming from the Lagos-Ibadan Expressway/Toll Gate/Ogudu axis inwards on Lagos Island would not be able to access Adekunle/Ebute-Metta from the Third Mainland Bridge.


Ms Kesha urged motorists to make use of alternative routes such as Carter Bridge, Gbagada, Ikorodu Road, Ojota, and Funsho Williams Avenue to avoid congestion on the Third Mainland Bridge.


She assured that signage had already been placed at strategic locations including billboards, while traffic officials would be on ground to help motorists.


She urged motorists and other road users to be patient and obey officials and traffic rules during the period of repairs.


She stressed earlier announcements on the scope of work announced by the Minister of Works, David Umahi, which included resurfacing of the entire bridge, replacement of expansion joints, and solar light installation, among others.


The controller assured that all vandalised furniture on the highway, including guard rails, would be replaced.


She appealed to the public to be vigilant and report vandals destroying common assets. 

(NAN)

We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.

More from Peoples Gazette

farmers

Agriculture

FG tasks ECOWAS on leveraging financing strategies for agroecology

The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Katsina State

Politics

Katsina youths pledge to deliver over 2 million votes to Atiku

“Katsina State is Atiku’s political base because it is his second home.”

Iyabo Obasanjo

States

Iyabo Obasanjo returns to PDP, gets Ogun central senatorial ticket

She promised to uphold the ideals of the PDP and serve with integrity, humility and dedication.

Bashir Adeniyi

Heading 2

Customs, ABC strengthen trade ties 

Ms Enwereji called for faster mechanisms to resolve outstanding challenges affecting businesses.

Federation Account Allocation Committee

Economy

FG, states, local governments shared N2.3 trillion May 2026 revenue: FAAC

He further explained that total deductions for cost of collection amounted to N123.546 billion. 

Imaan Sulaiman-Ibrahim (credit: Punch)

Heading 3

FG to establish GBV safe spaces in all 774 LGAs

She expressed concern over the increasing cases of GBV across the country.