Lagos-Calabar Highway: Umahi insists on detailed records for oversight bodies

Works minister Dave Umahi has directed project managers and engineers to maintain meticulous records for the Lagos-Calabar Highway, reiterating the need for detailed documentation by the end of September.
Mr Umahi, who gave the directive during an inspection of the project and some bridges in Lagos, said all construction levels must be carefully documented.
“All the levels, from existing ground level to levels after removing bad soil, refilling, and pavement, must be put together and shared with oversight bodies like the Economic and Financial Crimes Commission, the Independent Corrupt Practices and Other Related Offences Commission, and the National Assembly. When the job is done, people may forget, so these records are important,” he said.
The minister, who pointed out the importance of transparency, also instructed that two television stations should be taken to the site every week to show sections of the ongoing work to the public.
“People need to know what is happening here. It takes courage for the contractor, for the ministry, and for Mr President, who approved this project. When the road is completed, Nigerians may not understand the effort that went into it, so we must showcase it,” Mr Umahi said.
The minister noted that some sections required removal of poor materials to depths of between five and 20 metres before refilling with stone lumps and sand.
According to him, such deep fillings were critical for the road’s durability.
“I am very happy with Hitech. No other contractor would have done this. Their equipment and workforce remind me of an anthill, with trucks and machines working everywhere. There are so many unwritten things being done here for the stability of this job,” he said.
Mr Umahi commended the quality of sand filling, stone base, and reinforcement, describing Hitech Construction Company as “highly courageous and committed to national development”.
He added that the ministry would continue to approve certificates for payment without delay, as the works had been verified on-site.
The 700km Lagos-Calabar Coastal Highway is one of the federal government’s flagship road projects, aimed at boosting connectivity, trade, and development across coastal states.
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

States
Independence: NBA urges Nigerians to expect better future
The NBA said that ordinary Nigerians should be deriving benefit from the subsidy removal rather than hardship.

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

States
Police nab 14 suspects over attack on APC convoy in Katsina
Mr Sadiq-Aliyu said the incident occurred at about 11:00 a.m. on October 28.

NationWide
Tinubu arrives in Saudi Arabia for Umrah
Mr Tinubu is expected to return to Nigeria next week.

Heading 3
Shettima reaffirms Tinubu’s commitment to welfare of community health workers
Mr Shettima noted that the services of health workers sustained primary care, universal coverage and health sovereignty.

NationWide
Tantita acquires more drones, AI systems to curb pipeline vandalism, crude oil theft in Nigeria
Mr Enisuoh lamented the alarming rate of oil theft, pipeline vandalism and other illegal maritime activities

Heading 5
FRSC threatens punishment for overloading, mixed loading
Mr Mohammed said the corps would continue to enforce applicable regulations.

Heading 5
Institute urges INEC to address logistics gaps ahead of 2027 elections
Mr Emeje said Nigeria was underutilising the courier, logistics, transport and management sub-sector.





