Reconstruction: FG marks half of Iddo Bridge for demolition next week

A half of the Iddo Bridge in Lagos State will be demolished next week in preparation for rebuilding.
The Regional Manager of Julius Berger Nigeria, Thomas Christl, announced this on Sunday during an inspection tour of the bridge by the Minister of Works, Senator Dave Umahi.
He said, “Three spans of the existing Iddo Bridge are heavily damaged and need to be replaced. What we are doing at the moment is that we are separating the two lanes –the two directions– and next week, we will shift the traffic on one direction and one half of the bridge will be demolished and rebuilt.
“When this is done, by end of March, most likely, we will shift the traffic on the new side of the bridge and demolish this side of the bridge and rebuild this bridge.”
He said that the company was also constructing the bridge’s underpass.
He stated, “We have already started with the drainage works, the outfall to the lagoon is already done. After the drainage works, we will remove the soil and lower the road level so that we have a higher clearance for the bridge so that no trucks can crash into the bridge anymore which was a main reason for the damages on the existing one.”
Responding, Mr Umahi noted that Iddo Bridge suffered a fire outbreak because of illegal occupants.
He said that the fire damaged three spans on both carriageways.
He stated, “Six spans are affected. What we have done is to re-asphalt one of the carriageways so that we drive that traffic totally over there and then remove the three spans of one carriageway. Then we can divert the traffic back and demolish the second carriageway.”
Mr Umahi said that the work, to cost N15 billion, would be expected to end in June.
He said, “Part of the problem is that the headroom is about 4.5 metres high but the minimum should be 5.6 metres high; so, we are trying to achieve that minimum headroom.”
He said that the contractor had done a significant part of the headroom and demolished the first three spans of the first carriageway.
“They have also built a bypass route over there. Julius Berger is doing well. I hope they don’t delay the job. I am directing the engineer to monitor them and report back to us to ensure that this is completed as scheduled – June,” he said.
The minister gave the assurance that, at end of the repair, the Federal Government would install a close circuit television camera to monitor activities under the bridge and on its top, like what the government did on the Third Mainland Bridge.
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

States
Troops kill one IPOB member in Anambra, recover explosive devices
Troops raided IPOB and ESN stronghold in Ogbaru Local Government Area of Anambra State and killed one of their members.

Sport
Beach Volleyball: Nigeria beat Morocco, qualify for Los Angeles 2028 Olympics
The Nigerian women’s beach volleyball team qualified for the Olympic Games event for the first time in history after defeating Morocco 2-0 in the 2026 CAVB final on Saturday.

Agriculture
Ekiti LG distributes improved cocoa seedlings to farmers
The chairman of Ikole Local Government Area, Bayo Omojola, said the seedlings would boost earnings and improve farmers’ livelihoods.

Economy
PENGASSAN elects Bosun Olabiyi-Agoro as national president
Mr Olabiyi-Agoro succeeds Festus Osifo, who served as the association’s national president for six years.

States
Fire guts Calabar mall
The inferno reportedly started around 7:00 a.m. in a section of the mall before spreading rapidly and growing into a huge fire.

Politics
2027: Shun thuggery, promote peace, Plateau CP tells youths
Mr Faniyan said youths remain central to democracy and national development.






