Kogi govt demands improved work pace at Lokoja market

The Kogi government on Friday directed contractors handling the Lokoja Ultra Modern Market to sustain an improved pace of work and meet the required quality standards.
The directive followed an on-site inspection and monthly project review meeting involving stakeholders from the ministries of housing, works, and commerce and industry.
The review, chaired by the commissioner for housing and urban development, Taiye Abanika, assessed progress and addressed technical issues affecting project delivery.
Representing the commissioner for commerce and industry, Muhammed Shuaibu, permanent secretary Sualihat Musa-Amana commended the progress recorded on the project.
Mr Shuaibu, however, urged greater commitment from the project team, saying residents expected a facility that would surpass existing market standards.
He also commended members of the project committee for their continued participation and commitment to the review process.
During the meeting, stakeholders examined updates from the previous review and inspected the drainage system around the warehouse section.
The committee directed that sections expected to handle heavy water volumes should be enlarged where necessary to improve drainage capacity.
It also directed that the required technical specifications and corrections be formally communicated to the contractor for implementation.
The contractor reported that wall tile samples had been selected and approved, while approved floor tiles were being procured.
Stakeholders also reviewed toilet facilities, noting that floor tiling remained incomplete, although materials were already being sourced for the work.
The contractor submitted a revised programme of works reflecting the project’s current status for further consideration by stakeholders.
The committee agreed to study the programme and circulate it through the project’s official communication platform for additional review.
On warehouse automation, the contractor said the automated doors being installed had battery backups capable of operating for up to 30 minutes.
It added that a manual remote-control override had also been provided to maintain access during prolonged power outages.
Stakeholders directed that partition walls between individual stalls and warehouse compartments should extend fully to secure traders’ goods.
They said full-height partitions would also prevent unauthorised movement between adjoining stalls and warehouse compartments within the market.
The contractor confirmed that partition-wall construction was already ongoing across the affected sections of the project.
On possible stall relocation, the contractor explained that construction was based strictly on the approved design and existing project specifications.
It said any units intended to be mobile would require separate written instructions before changes could be made.
Stakeholders also sought clarification on the regular presence of the project supervisor during site meetings and discussed a request for additional office equipment.
The contractor presented its progress report covering Aug. 13 to Sept. 11, which stakeholders received with commendation.
Stakeholders observed visible improvements in the pace and quality of work compared with the previous review and site inspection.
Commissioner for works, Deedat Salami, commended the contractor’s performance and urged the team to sustain the standard achieved.
Mr Salami said government recognition would be reserved for contractors demonstrating genuine commitment to quality delivery and project execution.
He said such commendation was intended to motivate the contractor to maintain and improve the current standard of work.
The commissioner expressed optimism that further progress would be recorded before the next project review meeting scheduled for the end of September.
Stakeholders expressed confidence that the improved pace would continue as the government works towards delivering the market to international standards.
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

States
Independence: NBA urges Nigerians to expect better future
The NBA said that ordinary Nigerians should be deriving benefit from the subsidy removal rather than hardship.

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

Politics
2027: NDC to inaugurate presidential council October 20
The chairman said the party was taking time to make appropriate appointments to avoid disagreements that could disrupt its campaigns.

World
About one million without electricity after hurricane makes landfall in Florida
Isaias peaked as a category three hurricane, with heavy rain and powerful winds, but has since been downgraded.

Lagos
Lagos targets 3,000MW electricity supply by March 2027
Mr Sanwo-Olu said the initiative is part of efforts to end blackouts and build a 24-hour power economy in the state.

Politics
Nigeria at its best in 12 years; no govt has built infrastructure like my husband’s, says Remi Tinubu
Mrs Tinubu also cited the administration’s food support programme, saying it was designed to provide nutritious food for children.

States
Turkish Airlines increases Lagos flights from seven to 10 weekly
The statement added that the increase was aimed at meeting the growing travel demand between Nigeria and Türkiye.

States
Gov Yusuf condoles victims of bandit attack in Kano
Mr Yusuf assured residents that the state government was intensifying efforts to strengthen security through collaboration with relevant security agencies.





