Lagos-Calabar highway section one 70% complete: Umahi

The minister of works, Dave Umahi, has clarified on the Lagos-Calabar Coastal Highway project implementation, saying that it is the section one of the project that is 70 per cent completed.
Mr Umahi made the clarification in an interview with joutnalists during a tour of some bridges on the Lagos-Ibadan Expressway, on Thursday.
“Some of you reported that I said the Lagos-Calabar Coastal Highway was 70 per cent done and will be finished by January 2026.
“That is not what I said. We were dealing with section one, and then, we said, as at today, that section one, which is 47.47km, has been 70 per cent completed,” he said.
The minister said that the entire Section One of the Lagos-Calabar Coastal Highway would be completed by January 2026.
Mr Umahi said that the coastal highway would be tolled.
“On the Lagos-Ibadan Expressway, which he also inspected, Umahi said: “We checked five bridges, and we discovered that we have a problem in as much as the standard headroom in bridge design is 5.6 metres.”
He noted that some of the bridges were up to 6.2 metres while some were 5.6 metres.
“The least we had was one that was 5.4 metres.”
He regretted that some of the beams were being hit by vehicles, posing dangers.
“Of the five bridges we inspected, our directive is that we are going to descend the carriageway.
“ We are going to dig up to one metre and then reconstruct the carriageway,” he said.
Mr Umahi said that the aim was to create headroom that would be up to 6.5 metres.
He directed that the minimum requirement henceforth would be 6.5 metres to achieve the desired results.
The minister said he had directed that the Alapako Bridge in Ogun should be closed.
“The way it is now is very dangerous because a lot of the beams are compromised by vehicles.”
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

Diaspora
God cleared me of corruption charges: Diezani
She said the ruling marked the end of 11 years of torment.

Abuja
Court remands corps member over alleged assault on neighbour
The defendant, however, pleaded not guilty to the charge.

NationWide
Nigeria’s transport system requires urgent, predictive, integrated solutions: CILT
He said that lack of policy continuity would make Nigeria’s transport sector to be constrained.

States
ADSIEC presents certificates of return to newly elected council chairmen in Adamawa
The local government council elections were held on Saturday, June 13.

States
ADC governorship aspirant sues party over primary election result in Oyo
Mr Alagbe prayed the court to pronounce him as the authentic winner of the primary election.

States
NHRC, UNHCR seek improved community-based protection for displaced persons
Mr Bisu urged participants to become active human rights advocates within their communities by promptly reporting violations and protection risks.






